Downtime Management System -Validate? - AskaboutValidation forum

Go Back   AskaboutValidation forum > SOFTWARE VALIDATION - SPONSORED BY PREMIER VALIDATION www.premiervalidation.com > GOOD COMPUTER SYSTEM VALIDATION

Notices

Reply
 
Thread Tools Display Modes
  #1  
Old 01-05-2010, 03:35 PM
Alitoast Alitoast is offline
Validation Analyst
 
Join Date: Feb 2008
Location: Ireland
Posts: 7
Default Downtime Management System -Validate?

Hi,
My company like many others have initiated a lot of lean manufacturing initiatives in the last couple of years and are now looking to install a downtime management system on their packaging lines.

My concern is that, currently, our downtime is recorded in our manufacturing record and as such forms part of the overall batch record. My initial thoughts were that as a result, the system should be validated. But now i am having second thoughts, is downtime a GMP record (it is not listed in the GMP guide as a record that must be kept from a GMP viewpoint). Therefore, my query is do i have to validate such a system. I firmly believe that if i dont then i must have a good case documented for my decision.

I dont envisage any risk to product if i dont validate this system, one important point is that the system will print out a report (a log of downtimes) which will be signed by production and added to the batch record so it is not an electronic record either.

Anyone have any thoughts?



alitoast

Last edited by Alitoast; 01-05-2010 at 03:43 PM.
Reply With Quote
  #2  
Old 01-14-2010, 03:24 PM
Validation Monkey Validation Monkey is offline
Validation Analyst
 
Join Date: Jun 2008
Location: UK - South East
Posts: 25
Default

Hi,

If it's in your batch doc then it must be validated as you are submitting the data to a regulatory agency.

Why do you (as a company) stick that sort of info in a batch doc? The only reason I can immediately think of for including it is if something in your packaging process is time critical e.g. you thermoform on a continuous basis and have qualified the former upon continuous operation and have no reject function on the lines for material which has sat on the forming station too long? Far fetched I know, but it does seem very odd that this info would go into a batch doc.

Cheers

Monkey
Reply With Quote
  #3  
Old 02-10-2010, 03:13 AM
Tony C Tony C is offline
Validation Analyst
 
Join Date: Feb 2010
Posts: 2
Default

Quote:
Originally Posted by Alitoast View Post
Hi,
our downtime is recorded in our manufacturing record and as such forms part of the overall batch record.
Anyone have any thoughts?
alitoast
Hi Ali

There must be a reason why downtime is recorded. If so why? If it is important it should be validated.

Regards,

Tony
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

All times are GMT. The time now is 08:16 AM.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2010, Jelsoft Enterprises Ltd.