Water System PQ - AskaboutValidation forum

Go Back   AskaboutValidation forum > VALIDATION DOCUMENTATION > PQ (PERFORMANCE QUALIFICATION)

Notices

Reply
 
Thread Tools Display Modes
  #1  
Old 04-06-2009, 11:16 AM
Niamh Niamh is offline
Validation Analyst
 
Join Date: Apr 2009
Location: Ireland
Posts: 2
Default Water System PQ

I am writing a water system PQ for a labscale water system, I am a aware of a phased approach to PQ for full size water systems; i.e. Phase 1: monitor the performance of each water system component and overall performance; Phase 2: monitor performance of water system and 'tweak'; update SOPs on sanitisation and cleaning etc. Phase 3: continued routine monitoring on system.

Can somebody tell me where this phased approach comes from; what regulation or guideline; can't find it in any of the EU guidelines...

thanks, Niamh
Reply With Quote
  #2  
Old 04-17-2009, 02:49 AM
Shahnawaz Shahnawaz is offline
Validation Guru
 
Join Date: Aug 2007
Posts: 229
Send a message via MSN to Shahnawaz
Default

Quote:
Originally Posted by Niamh View Post
I am writing a water system PQ for a labscale water system, I am a aware of a phased approach to PQ for full size water systems; i.e. Phase 1: monitor the performance of each water system component and overall performance; Phase 2: monitor performance of water system and 'tweak'; update SOPs on sanitisation and cleaning etc. Phase 3: continued routine monitoring on system.

Can somebody tell me where this phased approach comes from; what regulation or guideline; can't find it in any of the EU guidelines...

thanks, Niamh
Dear Niamh,

You can refer WHO TRS-937 and FDA guidelines , where you will find it.

Regards
__________________
Shahnawaz Sajid
Reply With Quote
  #3  
Old 12-02-2009, 02:34 PM
intendica intendica is offline
Validation Analyst
 
Join Date: Dec 2009
Location: Netherlands
Posts: 1
Send a message via ICQ to intendica
Default Water System PQ

The right man for the right job. You did such a great job. If I got a bigger place i will use your method for water system.
__________________
refinancing loan
Reply With Quote
  #4  
Old 01-31-2010, 08:06 AM
alluri2025 alluri2025 is offline
Validation Analyst
 
Join Date: Jan 2010
Posts: 6
Default Guidelines

PIC/s, PDA and FDA also discussed about this phase manner.
Reply With Quote
  #5  
Old 02-02-2010, 06:06 AM
srikanth04gene srikanth04gene is offline
Validation Analyst
 
Join Date: Feb 2010
Location: Hyderabad , India
Posts: 3
Smile Phased qualification of water sytem is mentioned in Annexure 3 of WHO TRS 929

Quote:
Originally Posted by Niamh View Post
I am writing a water system PQ for a labscale water system, I am a aware of a phased approach to PQ for full size water systems; i.e. Phase 1: monitor the performance of each water system component and overall performance; Phase 2: monitor performance of water system and 'tweak'; update SOPs on sanitisation and cleaning etc. Phase 3: continued routine monitoring on system.

Can somebody tell me where this phased approach comes from; what regulation or guideline; can't find it in any of the EU guidelines...

thanks, Niamh
Phased qualification of water sytem is mentioned in Annexure 3 of WHO TRS 929 , if you require I shall send it to your mail ID send your contact

Last edited by srikanth04gene; 02-02-2010 at 06:07 AM. Reason: adding the contact requirement
Reply With Quote
  #6  
Old 02-02-2010, 06:09 AM
srikanth04gene srikanth04gene is offline
Validation Analyst
 
Join Date: Feb 2010
Location: Hyderabad , India
Posts: 3
Default

water ssytem design mentioned in WHO TRS 929 annex 3 , where you will find all the detail sregarding design requirements , installation and operation checks and performance requirements ( Philosophy )
Reply With Quote
  #7  
Old 04-10-2010, 03:55 AM
jameshock jameshock is offline
Validation Analyst
 
Join Date: Apr 2010
Posts: 4
Default

The list of PQ’s Industrial Chemical Division literature that is available. You may opt up to three pieces of literature per request by checking the box next to each. After you have made your selections, click the Process Selection button at the crowning of this page. Then on the Contact page wage the required aggregation and click the Submit button. If you require more than three items please submit a new request. Your literature module be armoured promptly.
__________________
Think big thoughts but relish small pleasures.
Reply With Quote
  #8  
Old 05-12-2010, 01:08 PM
patrick076 patrick076 is offline
Validation Analyst
 
Join Date: May 2010
Posts: 1
Default

Quote:
Originally Posted by alluri2025 View Post
PIC/s, PDA and FDA also discussed about this phase manner.



where is this discussion located any link
__________________
PATRICK THOMSON
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

All times are GMT. The time now is 08:30 PM.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2010, Jelsoft Enterprises Ltd.